Watch: Germany demolishes sections of major highway bridge in controlled blast
Sections of the A7 motorway bridge over the Thalaubach valley near Fulda were demolished in a controlled blast as part of a major replacement project. The 1968 viaduct is being rebuilt to handle modern traffic, with the new structure expected to be completed in stages by 2027.
Sections of the A7 motorway bridge over the Thalaubach valley near Fulda were demolished in a controlled blast as part of a major replacement project. The 1968 viaduct is being rebuilt to handle modern traffic, with the new structure expected to be completed in stages by 2027.